Skip to content

Masonry quote template: Shappy prices the structural work item by item

Footings, slab, walls, render: a masonry quote has a lot of lines. Tell Shappy the job on WhatsApp, with lengths and areas. Shappy prices every element per metre or per m² with your rates and prepares the quote. You review it, your client signs on screen.

See the quote made by Shappy

Free trial. Nothing to install: WhatsApp is enough.

The masonry quote Shappy prepares

ShappyWhatsApp

You : Mr Moreau, 20 m² block extension. Trenches and footings 22 m, 3-course base, 12 cm slab 20 m², walls 52 m², ring beams and lintels 30 m. 2.4 m opening in the existing wall with a steel beam. Render 52 m², 2 window sills, spoil removal.9:41

Shappy : The 11 items are ready. Total: €18,974.00 excl. VAT, €22,958.54 incl. VAT. Deposit on signature: €6,887.56. Here is the quote to check.9:41

Quote made by Shappy
Maçonnerie Les FondationsRue des Artisans 12, 1000 TownTel. 01 23 45 67 46 · contact@les-fondations.comCompany no. : 0123.456.746 · VAT no. : XX 0123.456.746
Quoteno. DEV-0146
Date of issue
DD/MM/YYYY
Offer valid for
30 days from the date of issue
Client
Mr MoreauRoute des Chênes 16, 1000 Town
Site address
Route des Chênes 16, 1000 Town
Scope
Structural work for a 20 m² concrete block extension, with an opening in the existing wall.
Quote no. DEV-0146, Mr Moreau
Ref.DescriptionQtyUnitUnit priceVATTotal excl. VAT
1Site set-up and foundations
1.1Setting out, site set-up, fencing and access1lump sum€650.0021%€650.00
1.2Excavation and strip trenches 50 x 60 cm, by mechanical digger22lin. m€48.0021%€1,056.00
1.3Reinforced concrete strip footings at 350 kg, HA reinforcement22lin. m€115.0021%€2,530.00
1.4Plinth in hollow formwork blocks, 3 courses, filled with concrete22lin. m€95.0021%€2,090.00
Subtotal Site set-up and foundations€6,326.00
2Ground slab
2.120 cm crushed stone hardcore, polythene membrane, welded mesh and 12 cm concrete slab20m²€78.0021%€1,560.00
Subtotal Ground slab€1,560.00
3Walls
3.120 cm hollow concrete block walls laid in mortar52m²€72.0021%€3,744.00
3.2Horizontal and vertical ring beams, reinforced concrete lintels30lin. m€48.0021%€1,440.00
3.32.4 m opening in the existing wall: propping, sawing, HEA steel beam and concrete padstones1lump sum€2,800.0021%€2,800.00
3.4Precast concrete window sill2pc€120.0021%€240.00
Subtotal Walls€8,224.00
4Render and clearance
4.1Scraped one-coat render on the façade, colour chosen by the client52m²€42.0021%€2,184.00
4.2Removal of soil and rubble by skip1lump sum€680.0021%€680.00
Subtotal Render and clearance€2,864.00
Terms
Estimated duration of the works5 weeks
Deposit30% of the total incl. VAT on signature, balance on completion of the works
Payment terms30 days from the invoice date
Payment methodbank transfer, IBAN XX00 0000 0000 0046, reference: DEV-0146
Summary11 items
Total excl. VAT€18,974.00
VAT 21%€3,984.54
Total incl. VAT€22,958.54
Deposit 30% on signature€6,887.56
Balance on completion of the works€16,070.98

Approved

Client signature

« Approved »

Name and dateBy hand, on screen
Company signature

For Maçonnerie Les Fondations

Name and dateBy hand, on screen

Maçonnerie Les Fondations · Rue des Artisans 12, 1000 Town · Company no. 0123.456.746 · IBAN XX00 0000 0000 0046

The items on a masonry quote

Set-up
Setting out and site set-up, as a lump sum.
Footings
Trenches, footings and base courses, per linear metre.
Slab
Hardcore, membrane and reinforced slab, per m², with the thickness.
Walls
Block walls per m², ring beams and lintels per linear metre.
Openings
Opening in an existing wall, as a lump sum, beam included.
Render and finishes
Render per m², window sills per piece, spoil removal as a lump sum.

Your masonry quote in 3 steps

  1. 1. Tell Shappy the job

    By voice note or in writing, on WhatsApp: items, quantities, deposit. Add a photo or a plan if needed.

  2. 2. Shappy prepares the quote

    With your price library and your templates. Every line is calculated, and so is the total.

  3. 3. You review and get it signed

    Edit, add an item, send it as a PDF, by link or by email. Your client and your company sign on screen.

From signed masonry quote to invoice

  1. Signed on screen

    Your client signs by hand on phone or tablet, and so does your company.

  2. Versions

    Every change creates a version. You know which one was signed.

  3. Deposit in 1 click

    Once the quote is signed, the deposit becomes an invoice.

  4. Peppol e-invoicing included

    Your invoices go out on Peppol, with no extra module.

SHAPP Construction runs the rest of the job too

Planning, purchasing, site tracking, margin and invoices: SHAPP Construction runs the whole business. Shappy drives it from WhatsApp, Telegram, Grok Bot, ChatGPT, Claude and Slack.

Other quote templates

All construction quote templates

Masonry quote template: frequently asked questions

What should a masonry quote include?

A masonry quote lists every element: site set-up, footings, slab, walls, ring beams, openings, render and spoil removal. Every line shows the quantity, unit, unit price excluding VAT and total, with the dimensions of the work.

Which units should a masonry quote use?

m² for walls, slabs and render, linear metres for footings, ring beams and lintels, pieces for sills and one-off elements, a lump sum for set-up and removal. One unit per line makes the quote easy to read and to invoice.

How do you invoice a masonry job in stages?

The signed quote sets the deposit. You then invoice progress item by item, deposit deducted, then the final invoice. E-invoices go out on Peppol from SHAPP.

Your next masonry quote: just tell Shappy.

Free trial, on your real jobs.